Warning: mkdir(): No space left on device in /www/wwwroot/NEW7.COM/func.php on line 127

Warning: file_put_contents(./cachefile_yuan/bjdfdg.com/cache/c8/85bc5/42a2c.html): failed to open stream: No such file or directory in /www/wwwroot/NEW7.COM/func.php on line 115
沼气泡芙视频下载地址调试步骤方法济柴介绍!_公司泡芙短视频官网入口_泡芙短视频官网入口中心-济南济柴泡芙短视频污燃气发电设备有限公司



  1. 泡芙短视频污,泡芙视频下载地址,泡芙旧版安装包,泡芙短视频官网入口

    欢迎进入济南济柴泡芙短视频污燃气发电设备有限公司官网!

    公司泡芙短视频官网入口

    沼气泡芙视频下载地址调试步骤方法济柴介绍!

    返回 2021.10.15 来源:http://www.bjdfdg.com 0
    气泡芙视频下载地址作为机组类型的一种,使用行业很多,例如养殖业、食品类废水处理、餐厨垃圾处理等也利用沼气泡芙视频下载地址等。下济柴介绍一下沼气泡芙视频下载地址的调试方法步骤,希望能给用户带来参考。
    As a type of unit, gas generator sets are used in many industries, such as aquaculture, food wastewater treatment, kitchen waste treatment, etc. biogas generator sets are also used. Next, jichai introduces the commissioning methods and steps of biogas generator set, hoping to bring reference to users.
    1、查抄沼气泡芙视频下载地址局部的外导体衔接没有断线,此时用电压表丈量D+点有无电压,并察看充电指示灯能否亮堂。
    1. Check that there is no disconnection in the connection of local external conductor of biogas generator set. At this time, measure the voltage at point D + with a voltmeter, and check whether the charging indicator light is on.
    2、将钥匙门开的地位上去,但不启动沼气泡芙视频下载地址,此时用电压表丈量电压能否在D点和察看充电指示灯和亮堂。
    2. Open the key door, but do not start the biogas generator set. At this time, use a voltmeter to measure whether the voltage is at point D and check whether the charging indicator light is on.
    3、启动沼气泡芙视频下载地址,该沼气泡芙视频下载地址在B点用电压表丈量电压,应到达以下值加减油门电压24V体系电压27V以上电压高于12燃气泡芙视频下载地址V的13V体系,而有一点点的变革0.1~0.2V。
    3. Start the biogas generator set. The voltage of the biogas generator set shall be measured with a voltmeter at point B, which shall reach the following value. Add or subtract the throttle voltage 24V system voltage above 27V, and the voltage is higher than the 13V system of 12 gas generator set V, with a little change of 0.1 ~ 0.2V.
    4、翻开局部负荷,如灯12V体系电压超13V同时加减油门电压24V体系电压27V或中度的变革在0.2~0.4V。
    4. Turn over the local load. For example, the lamp 12V system voltage exceeds 13V, and increase or decrease the throttle voltage 24V, and the system voltage 27V or moderate change is 0.2 ~ 0.4V.
    5、翻开空调,灯光等重要电气体系电压为13V12V以上的油门,而减法,电压24V体系27V以上的电压有较大水平的变革0.5~1V。
    5. Turn on the accelerator with the voltage above 13v12v in air conditioning, lighting and other important electrical systems, while the subtraction shows that the voltage above 27V in 24V system has a great change of 0.5 ~ 1V.
    三步中沼气泡芙视频下载地址无电压输入,能够作为一种办法来查抄。
    In the three steps, the biogas generator set has no voltage input, which can be checked as a method..
    泡芙短视频官网入口搜索
    济南济柴泡芙短视频污燃气发电设备有限公司
    • 服务热线

      0531-62325028
      0531-69951266

    沼气泡芙视频下载地址调试步骤方法济柴介绍!

    气泡芙视频下载地址作为机组类型的一种,使用行业很多,例如养殖业、食品类废水处理、餐厨垃圾处理等也利用沼气泡芙视频下载地址等。下济柴介绍一下沼气泡芙视频下载地址的调试方法步骤,希望能给用户带来参考。
    As a type of unit, gas generator sets are used in many industries, such as aquaculture, food wastewater treatment, kitchen waste treatment, etc. biogas generator sets are also used. Next, jichai introduces the commissioning methods and steps of biogas generator set, hoping to bring reference to users.
    1、查抄沼气泡芙视频下载地址局部的外导体衔接没有断线,此时用电压表丈量D+点有无电压,并察看充电指示灯能否亮堂。
    1. Check that there is no disconnection in the connection of local external conductor of biogas generator set. At this time, measure the voltage at point D + with a voltmeter, and check whether the charging indicator light is on.
    2、将钥匙门开的地位上去,但不启动沼气泡芙视频下载地址,此时用电压表丈量电压能否在D点和察看充电指示灯和亮堂。
    2. Open the key door, but do not start the biogas generator set. At this time, use a voltmeter to measure whether the voltage is at point D and check whether the charging indicator light is on.
    3、启动沼气泡芙视频下载地址,该沼气泡芙视频下载地址在B点用电压表丈量电压,应到达以下值加减油门电压24V体系电压27V以上电压高于12燃气泡芙视频下载地址V的13V体系,而有一点点的变革0.1~0.2V。
    3. Start the biogas generator set. The voltage of the biogas generator set shall be measured with a voltmeter at point B, which shall reach the following value. Add or subtract the throttle voltage 24V system voltage above 27V, and the voltage is higher than the 13V system of 12 gas generator set V, with a little change of 0.1 ~ 0.2V.
    4、翻开局部负荷,如灯12V体系电压超13V同时加减油门电压24V体系电压27V或中度的变革在0.2~0.4V。
    4. Turn over the local load. For example, the lamp 12V system voltage exceeds 13V, and increase or decrease the throttle voltage 24V, and the system voltage 27V or moderate change is 0.2 ~ 0.4V.
    5、翻开空调,灯光等重要电气体系电压为13V12V以上的油门,而减法,电压24V体系27V以上的电压有较大水平的变革0.5~1V。
    5. Turn on the accelerator with the voltage above 13v12v in air conditioning, lighting and other important electrical systems, while the subtraction shows that the voltage above 27V in 24V system has a great change of 0.5 ~ 1V.
    三步中沼气泡芙视频下载地址无电压输入,能够作为一种办法来查抄。
    In the three steps, the biogas generator set has no voltage input, which can be checked as a method..
    网站地图